KHABRE TV NEWS - Today in Hilsa subdivision, site inspection was done for the implementation of various schemes, District Officer, Nalanda Yogendra Singh.
Today in Hilsa subdivision, site inspection was done for the implementation of various schemes, District Officer, Nalanda Yogendra Singh.
(KHABRE TV - 9523505786) - In this order, he inspected the under construction bypass at Ekangar Sarai. This bypass is being constructed as a greenfield project. This 3.8-km long bypass road will depart from Raksa Mouza of SH-4 and cross NH 110 at Dhawa, near SH-4 near Maharajganj. Soil work is being done in this bypass. The target is to complete the construction work of this bypass in a period of about 1 year. It is being constructed by the Road Construction Department Path Division Hilsa. The District Officer directed the Executive Engineer Path Division Hilsa Sanjay Sharma present on the spot to complete the construction work of this bypass within the targeted time frame.
In the course of field visits, the district officer also inspected the repair work done in last year's flood embankment on Lokayan river near Pachasa in Hilsa block. This embankment has been repaired by the flood control and drainage division of Ekangar Sarai. Executive Engineer of the flood division was also present during this period.
The District Officer also inspected the site of various possible sites for the construction of the museum at Telhara and gave necessary guidelines to the Zonal Officer and Land Reform Deputy Collector present on the spot. Soon, a proposal for a suitable site for museum construction will be sent from the district level.
In the order of inspection, sub-divisional officer Hilsa, land reforms sub-collector Hilsa and local block development officer, zonal officer and other officials were present.
Comments
Post a Comment